[2007 - 2008]

Project management of concept and business model development; site audit; preparation of data-center design.

Project characteristics:

  • 10,000 sq.m. of server rooms;
  • 1,614 W/sq.m. (4.5 kW/rack);
  • 32 MW – power capacity;
  • TIER III –reliability level of infrastructure.

 

#2

[2007 - 2009]

  • Project management of IT- and engineering infrastructure creation along with the offices and auxiliary rooms construction in the Federation tower (30 floors, 2,100 sq.m. each).
  • Participation in the development and agreement of technical and design solutions + construction inspection.
  • Coordination of project team participants (5 major contractors).
  • Performance quality and implementation standard control.
     

Project characteristics:

  • ~650 sq.m. of server room;
  • 17 systems; 
  • refrigerating plant, Lamperts site; 
  • redundancy:
     2N – for air conditioning systems,
    2N+1 – for power equipment

#3

[2008]

  • Development of calculator which estimates data-center design and construction costs;
  • processes structuring and unification;
  • resource-intensiveness reduction on design work prestage (time, money, % of personnel’s involvement).